CASE 01
48 Hour Breakdown Recovery
- Customer
- GreenVale Foods
- Sector
- Food manufacturing
A worn conveyor drive shaft stopped a packaging line. We measured the failed component, produced a manufacturing drawing, turned and milled a replacement, inspected it and delivered it back to site.
Focus
- Reverse engineering
- CNC turning
- Keyway milling
- Inspection
- Delivery
Outcome: Replacement shaft delivered within the agreed window. Demonstration copy — recovery times depend on material and machine availability.